Network Scheduling Techniques for Construction Project Management Review

Network Scheduling Techniques for Construction Project Management
Average Reviews:

(More customer reviews)
The author has done moderate work on the book. It is easy to read and conceptualize. However, the price is too expensive and definitely cannot complete with these following books (not exclusive and not sorted in any order)

CPM in Construction Management (Pro Engineering) by James J. O'Brien, Fredric L. Plotnick (about $70 with CD including primavera, pertmaster, ....awesome)Precedence and Arrow Networking Techniques for Construction by Robert B. Harris (about $70)

Click Here to see more reviews about: Network Scheduling Techniques for Construction Project Management

Product Description:
The book is a synthesis of the state-of-the-art in projectmanagement concepts and techniques. The author places particularemphasis on precedence diagramming (PDM), at present the most widelyused scheduling method. New theoretical improvements of PDM arepresented, several for the first time in a book, such as: maximal typeof precedence relationships, calculating the minimal and maximalavailable project durations, leveling resources when maximalrelationships are used, and precedence diagramming time-costtrade-off. Discussions of computer implementation are includedthroughout the book. A PC-based software package called`ProjectDirector', containing the theoretical improvements describedin the book, is available from the author. Audience: Researchers, and undergraduate and graduate studentsin civil engineering, industrial engineering and operations research,as well as practitioners, managers, and contractors interested inproject management.--This text refers to the Hardcover edition.

Buy NowGet 10% OFF

Want to read more honest consumer review about Network Scheduling Techniques for Construction Project Management now ?

0 comments:

Post a Comment